Not All Planning Systems are Created Equal!

Posted by Bill Green on Tue, Apr 11, 2017

not-equal.jpgMost planning systems deploy more of a reactive strategy than a predictive one. In the former category, when a problem is identified regarding a capacity shortage, material shortage, or arrival of a high priority order, the system addresses the issue by rearranging the plan. There is nothing wrong with this except that it is not optimal and it is a Band-Aid solution that could have been avoided in the first place! Let me illustrate this using a simple example. If you release too many jobs to your resources (or factory), you build a big queue in front of resources creating much WIP adding to your inventory and delaying delivery dates. In addition, you diminish your capability to address inevitable but unforeseen problems such as shortages, equipment breakdowns, and arrival of surprise orders. But the interesting part is that, most people try to resolve this issue by having better sequencing rules for each resource. As you can see a problem that could have been avoided was created and now we are trying to reactively resolve it by locally expediting, which is almost impossible. This type of strategy is prominent in many S&OP solutions which tend to operate at a high level not knowing how the plan can be executed. They assume a fixed lead-time and assume maybe ONE bottleneck resource for the entire plan for every site, and then expect to have an accurate plan! However, when it comes to executing such plans there will be a lot of expediting and adding shifts and delays to name a few. Such an approach is no different than the use of spreadsheets for planning and use of fixed lead-times, which really implies infinite capacity planning. I remember MRP systems did that really well! Are we back to the technology of 80’s?

We believe that predictive planning avoids the problems in the first place and diminishes the need for reactive solutions. We also believe that any plan generated by the system has to be accurate enough so that it is executable. Spreadsheet type of planning (pre-defined bottlenecks, fixed lead-times and bucketed capacity) deployed by most S&OP solutions are simply NOT accurate enough! They give you a false sense of hope and control as well as poor visibility into what can be accomplished; resulting in erroneous delivery dates. By performing predictive planning, you can account for potential issues of shortages and breakdowns or even quality issues in advance. Furthermore, one can “release” the orders (virtually in subcontractor facilities or actually in your own) in a way that they do not have to wait for a long time in front of resources, reducing WIP and at the same time maximizing utilization. By producing realistic plans based on “shifting bottlenecks,” one can also ensure realistic due dates maximizing on-time delivery. Predictive planning is performed by having an accurate model of your supply chain (yours and your suppliers’) and understanding the mix of products that need to be built and how they compete for resources in a dynamic manner. In addition, making sure that we account for probability of breakdowns, demand variations, maintenance schedules, supplier lead-time variations and so on. By taking into account all such variations, one has a realistic model of the supply chain and can precisely predict the behavior and how each order can be delivered through different choices of the Supply, Make and Distribution. The key is to take all such combinations into account and optimize the use of resources and inventory using an optimal order release strategy that maximizes delivery performance, minimizes inventory and optimizes the utilization of resources. For additional information, please refer to Adexa Whitepapers on this topic by clicking HERE

Topics: Supply Chain Planning, Planning, best of breed planning systems, Sales & Operations Planning, S&OP